KIIFB PROJECT: CONSTRUCTION OF REGULATOR WITH LOCK ACROSS ANCHARAKANDY RIVER AT PARAPRAM IN PINARAYI PANCHAYATH, KANNUR DISTRICT
| Project |
KIIFB PROJECT: CONSTRUCTION OF REGULATOR WITH LOCK ACROSS ANCHARAKANDY RIVER AT PARAPRAM IN PINARAYI PANCHAYATH, KANNUR DISTRICT |
| Project Code |
KNRKIIFB072011 |
| Work Category |
RCB(Regulator Cum Bridge) |
Funding Agency |
KIIFB |
| Client Department |
WRD |
| Description |
The regulator across Anjarakandy River at Parapram in Pinarayi Panchayath is proposed in view of
preventing saltwater intrusion into about 1200 acres of land spread in Pinarayi, Vengad, Ancharakandy and
Peralasseri villages and to use the fresh water on upstream side of the regulator for irrigation. The
implementation of the project will solve the drinking water scarcity in this area and in similar other areas in
the basin. The Regulator connects Peralassery and Pinarayi panchaths by means of foot bridge .it plays a
major role by assuring the drinking water availability provided by the KWA pumping stations at Keezzhallur . |
| Status |
|
| District |
Kannur |
| Executing Office |
KIIDC OFFICE |
| AS Amount (Rs) |
463700000 |
| AS Number |
WRD022-11/APR-6/2020/KIIFB |
| TS Amount (Rs) |
413660264 |
| TS Number |
22/TS/KIIDC/2020-21 |
| Actual Project Completion Date |
Date is not specified |
| Coverage |
The regulator across Anjarakandy River at Parapram in Pinarayi Panchayath is proposed in view of
preventing saltwater intrusion into about 1200 acres of land spread in Pinarayi, Vengad, Ancharakandy and
Peralasseri villages and to use the fresh water on upstream side of the regulator for irrigation. The
implementation of the project will solve the drinking water scarcity in this area and in similar other areas in
the basin. The Regulator connects Peralassery and Pinarayi panchaths by means of foot bridge .it plays a
major role by assuring the drinking water availability provided by the KWA pumping stations at Keezzhallur . |
Packages
| No. |
Project Name |
Location |
View |
| No Packages has been added for this project. |
Overall Project Status
| Status Date |
Overall Project Status |
Project Officer |
Contact |
| 10 Aug 2022 |
Left Bank:
D/S Wing wall Final Lift Concreting.
Pier P1 First Lift Concreting (+0.05).
Pier P2 shoe Concreting |
DBA |
|
No project review have been added to this project
Duration & Sanction dates
| Date of start of Project |
15/11/2020 |
| Scheduled date of Completion of the Project |
31 Dec 2022 |
| Expected date of Completion |
15/05/2022 |
Processing Dates
| AS Date |
28 Jul 2020 |
| TS Date |
03 Sep 2020 |